PROJECT GALLERY
![](https://brightorangebsc.com/wp-content/uploads/2022/06/ashdown-300x226.png)
Ashdown House, Forest Row
This project comprises the conversion of a pre- prep school covering over 37 acres into luxury residential accommodation. The site includes the main schoolhouse Grade
![](https://brightorangebsc.com/wp-content/uploads/2022/06/fossett-300x224.png)
Fossetts Way, Southend-on-Sea
This is a multi-house development by Ilke Homes on a large site in Southend where all housing is pre-fabricated. Bright Orange have been commissioned to
![](https://brightorangebsc.com/wp-content/uploads/2022/06/stanford-300x237.png)
Stanford-le-Hope, Essex
This is a multi-house development by Ilke Homes on a large site in Stanford-le-Hope where all housing is pre-fabricated. Bright Orange have been commissioned to
![](https://brightorangebsc.com/wp-content/uploads/2020/09/IMG_0014-scaled-1-300x225.jpg)
FETTER LANE
This project comprised a CAT A Fit-Out to the first floor of 86 Fetter Lane. The systems comprised all new plant throughout including LED ECS
![](https://brightorangebsc.com/wp-content/uploads/2022/06/croydon-300x172.png)
Ye Olde Clock Tower, Croydon
This project comprises the building services design for this new build residential development to provide 6 new flats. The design incorporates the incoming services infrastructure
![](https://brightorangebsc.com/wp-content/uploads/2022/06/comroad-300x229.png)
539-541 Commercial Road, London
This project comprises the conversion of disused commercial space close to the Blackwall Tunnel in Commercial Road. The flats surround an earlier refurbishment of the
![](https://brightorangebsc.com/wp-content/uploads/2022/06/harrowlane-300x179.png)
Harrow Lane, Hastings
This is a multi-house development by Ilke Homes on a large site in Hastings where all housing is pre-fabricated. Bright Orange have been commissioned to
![](https://brightorangebsc.com/wp-content/uploads/2022/06/portmans-300x294.png)
Project Lycra, Portman Square, London
This project comprised the complete fit out of the whole fifth floor office space for a designated tenant requiring the complete installation of all services.
![](https://brightorangebsc.com/wp-content/uploads/2022/06/broadstreet01-300x216.png)
125 Old Broad Street, London
This project comprised the complete fit out of the whole fourth floor office space for a designated tenant requiring the complete installation of all services.
![](https://brightorangebsc.com/wp-content/uploads/2022/06/rainham-300x203.png)
Rainham, Essex
Proposed new build residential over 4 buildings comprising in excess of 200 apartments and 6 commercial units. Each block will have its own plantroom comprising
![](https://brightorangebsc.com/wp-content/uploads/2022/06/rainham-1-300x135.png)
New Road, Rainham
This project comprises the building services design for this new build residential development to provide 56 flats and 3 houses for rent. The design incorporates
![](https://brightorangebsc.com/wp-content/uploads/2022/06/new-road-300x191.png)
New Road, Digswell, Welwyn
Proposed 9No. new build apartments to replace an existing house. The challenge on this project was to avoid the use of gas but also avoid
![](https://brightorangebsc.com/wp-content/uploads/2022/06/projects-belvedere-300x171.png)
Belvedere Hotel, Dartford
This project is to convert a disused pub and hotel into 6No. Residential flats. In addition, there will be 3No. New Town Houses built adjacent.
![](https://brightorangebsc.com/wp-content/uploads/2022/06/exmouth-300x102.png)
Exmouth Junction, Exeter
This is a multi-house development by Ilke Homes on a large site in Exmouth where all housing is pre-fabricated. Bright Orange have been commissioned to
![](https://brightorangebsc.com/wp-content/uploads/2022/06/headstreet-300x134.png)
1 Head Street, London
This project comprises the demolition of an old, disused commercial unit close to the Blackwall Tunnel off Commercial Road. A new build apartment block of
![](https://brightorangebsc.com/wp-content/uploads/2022/06/Pladis-300x206.png)
Pladis, Chiswick
This project comprised the complete fit out of the whole third floor office space for a designated tenant requiring the complete installation of all services.
![](https://brightorangebsc.com/wp-content/uploads/2022/06/galleywood-300x189.png)
Galleywood Road, Great Baddow
Proposed 4No. new build bungalows to replace demolished redundant workshops and barns. The challenge on this project was to avoid the use of gas but
![](https://brightorangebsc.com/wp-content/uploads/2022/06/bournebrook-300x217.png)
Bournebrooke, Farnham
Proposed 9No. new build houses. The challenge on this project was to avoid the use of gas but also avoid PV due to cost as