Stanford-le-Hope, Essex

This is a multi-house development by Ilke Homes on a large site in Stanford-le-Hope where all housing is pre-fabricated. Bright Orange have been commissioned to undertake the design of 2No. Traditional apartment blocks comprising a total of 15 apartments. External gas meters and combi boilers have been selected as the preferred heat and hot water […]

Fossetts Way, Southend-on-Sea

This is a multi-house development by Ilke Homes on a large site in Southend where all housing is pre-fabricated. Bright Orange have been commissioned to undertake the design of the central Traditional apartment block comprising a total of 32 apartments. An internal gas meter room and combi boilers have been selected as the preferred heat […]

Project Lycra, Portman Square, London

This project comprised the complete fit out of the whole fifth floor office space for a designated tenant requiring the complete installation of all services. The mechanical and electrical services for the building had to be carefully considered at the initial design stages as the space available was limited. New energy efficient VRV air conditioning […]

125 Old Broad Street, London

This project comprised the complete fit out of the whole fourth floor office space for a designated tenant requiring the complete installation of all services. The mechanical and electrical services for the building had to be carefully considered at the initial design stages as the space available was limited. New energy efficient VRV air conditioning […]

Exmouth Junction, Exeter

This is a multi-house development by Ilke Homes on a large site in Exmouth where all housing is pre-fabricated. Bright Orange have been commissioned to undertake the design of the end Traditional apartment block comprising a total of 61 apartments. On this project Bright Orange have selected alternative ASHP systems for the apartment block with […]

Harrow Lane, Hastings

This is a multi-house development by Ilke Homes on a large site in Hastings where all housing is pre-fabricated. Bright Orange have been commissioned to undertake the design of 3No. Traditional apartment blocks comprising a total of 21 apartments. On this project Bright Orange have selected alternative ASHP systems for the apartment block with integral […]

Pladis, Chiswick

This project comprised the complete fit out of the whole third floor office space for a designated tenant requiring the complete installation of all services. The mechanical and electrical services for the building had to be carefully considered at the initial design stages as the space available was limited. New energy efficient VRV air conditioning […]

Project Orange

This is purely a coincidental project name that we have been commissioned to provide the Stage 4 building services design on behalf of Cloud Electrical Services. We have worked with Cloud on several commercial projects over the last few years and happy to continue with them as one of our valued clients.

FETTER LANE

This project comprised a CAT A Fit-Out to the first floor of 86 Fetter Lane. The systems comprised all new plant throughout including LED ECS lighting controlled systems and concealed heating and ventilation systems. The project was completed January 2021. Project Value: £2 million Client: Cloud Project type: Office Fit-Out Services: CAT A design

Bright Orange – New London Offices

Bright Orange is pleased to announce it’s new London Office location in Old Street Yard in the White Collar Factory. This location was chosen due to its location adjacent to Old Street tube station and ease of navigating across London to network with our clients. The office has all the modern facilities for visiting clients […]