New Road, Digswell, Welwyn

Share This Post

Proposed 9No. new build apartments to replace an existing house.

The challenge on this project was to avoid the use of gas but also avoid PV due to maintenance access as well as any external ASHP units.

We are using new technology in the form of combined heating and hot water heat store with an ASHP sitting on top of the unit. This is a ‘plug & play’ system suitable for smaller units providing 20 litres/sec hot water flow rate and ample heat source to serve underfloor heating.

Bright Orange also undertook the SAP calculations and EPC’s.


Project Value: £1.2 million

Client: Rival Construction

Project type: New Build Apartments

Services: MEP Full Design

More To Explore

COMMERCIAL

125 Old Broad Street, London

This project comprised the complete fit out of the whole fourth floor office space for a designated tenant requiring the complete installation of all services.

RESIDENTIAL

New Road, Digswell, Welwyn

Proposed 9No. new build apartments to replace an existing house. The challenge on this project was to avoid the use of gas but also avoid

RESIDENTIAL

Ashdown House, Forest Row

This project comprises the conversion of a pre- prep school covering over 37 acres into luxury residential accommodation. The site includes the main schoolhouse Grade

RESIDENTIAL

1 Head Street, London

This project comprises the demolition of an old, disused commercial unit close to the Blackwall Tunnel off Commercial Road. A new build apartment block of

A FRESH APPROACH TO BUILDING SERVICES

BELIEVING IN A BRIGHTER FUTURE

drop us a line and keep in touch